Suomi Test Miton Test Laboratories does heat testing (MT) and stress fasting ST) on materials and operates a capacity. Under is current piecosting system Monaggregates all operating costs of 51.200.000 tongle verhead cost pool Milton calculates are per fest hour of $16 ($1.200.000 / 75.000 totaltest hous) HT uses 50,000 fest hours, and ST ses 25,000 best hours. Gary Cole Milon's controller, believes that there is enough variation in test procedures and cost structures toetabish separate costing and billing for HT and ST The market for et services is becoming competitie Wimut this information any miscasting and pricing of its services could cause Milon to lose business Celeste divides Milan's costs of the (Click the icon to view the activity.cont categories Peained Activity-cost categories Requirement 1. Clasaty each activity cost as to unite batch-love, product or service stand Costem Cost-type Direct about b. Equipment costs, martean, energy) C. Setup costs d. Costs of designing Direc-bour costs $225.000 These can be directly traced to HT $175.000 and ST 350.000 b. Equipment related costs front maintenano, energy and so oni $375.000 These costs are located to HT and ST on the basis of tout how e. Setup costs $360,000. These coure located to HT and ST on the basis of the number of setup hours required. HT 10.000 hour and Tres 5.000 setup hou d. Costs of designing tests $240.000. These costs are allocated to HT and ST on the basis of the time required to design the tests. Treures 2.500 hours and ST gure 1.500 hours Output unit-level costs are Batch-level costs are Service-sustaining costs are Facillysurgcos are Print Done Choose from any list or enter any number in the input fields and then continue to the next question Requirement Coas the coul perforand ST Expany then why the other hands First the formed to do the forme Casper Catch and the other gang Seeds Do Ener Be Choose from any story Requited Setup Design Total Determine the formula to calculate the HT cost per test hour and enter the amounts to calculate the rate. (Round the rate to the nearest cont.) HT Cost per test-hour per test-hour Determine the formula to calculate the ST cost per tost hour and enter the amounts to calculate the rate. (Round the rate to the nearest cent.) ST Cont per test-hour per test-hour The cost per test-hour for HT and ST differs from the cost per test-hour using the simple rate because per test hour The cost per test-hour for HT and ST diters from the cont per hour using the simple rate bec Requitement. Explain the course of the products and wrg the simple country wystem and the ABC wython How motions were two why and ABCsomation to be manage its business? The accuracy of the product costs will be with the ABC system ind of the simple couting ystem. The ABC producents will the son of cs by both products Management can use the ABG costs to The cont hierarchy enable management to more accurately determine the course of