Superior Company currently uses a traditional costing system to assign overhead costs uniformly to all jobs at a rate of 20% of direct labor costs.
Superior Company currently uses a traditional costing system to assign overhead costs uniformly to all jobs at a rate of 20% of direct labor costs. The President has suggested adopting activity-based costing. Total estimated overhead allocated to the assembling cost pool is $3,500, estimated overhead allocated to the machining pool is $5,850, and estimated overhead allocated to the inspecting cost pool is $4,200. Data related to the production of picnic tables is below.
Activity Cost Pools | Cost Drivers | Expected Use of Cost Drivers per Activity | ABC Overhead Rate |
Assembling | Number of boards | ? | $0.35 |
Machining | Number of machine hours | ? | $13.00 |
Inspecting | Number of inspections | ? | $7.00 |
1) Compute the expected use of each cost driver for each activity.
2) Compute the total cost of job A492 which has $300 of direct materials cost, $280 of direct labor cost, 50 boards, 10 machine hours, and 1 inspection, using (a) the activity-based costing system AND (b) the traditional costing system.
3) By what amount does the traditional product costing system undercast or overcast the picnic table production line?
4) Classify each of the activities as value-added or non-value-added.
Step by Step Solution
★★★★★
3.44 Rating (157 Votes )
There are 3 Steps involved in it
Step: 1
1 Overhead rate in activity based costing Cost pool for activity Cost drivers of that activity So in ...Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started