Answered step by step
Verified Expert Solution
Question
1 Approved Answer
[Supplement 7] Capacity and Bottleneck Analysis A production system at Lakeview Manufacturing is given in the flowchart below. The bending operation occurs separately from, and
[Supplement 7] Capacity and Bottleneck Analysis A production system at Lakeview Manufacturing is given in the flowchart below. The bending operation occurs separately from, and simultaneously with, cutting and drilling, which are independent and sequential operations. A product needs to go through only one of the three parallel assembly operations. The product then proceeds to the last workstation for testing. Assembly 1.5 units/hour Cutting 7.5 units/hour Drilling 10 units/hour Welding 5 units/hour Assembly 1.5 units/hour Testing 4 units/hour Bending 6 units/hour Assembly 1.5 units/hour Answer the following questions based on the flowchart. Write your final answer only (without intermediate steps) for the fill-in-the-blank questions. Question 36 (4 points) Which operation is the bottleneck? Assembly Welding Cutting Bending Drilling Testing Question 37 (4 points) The bottleneck time = A) minutes per unit. Use 2-decimal accuracy for the final answer, e.g., 0.12, when necessary. Question 38 (4 points) For the entire production system, the throughput time = A minutes. Use 2-decimal accuracy for the final answer, e.g., 0.12, when necessary. Question 39 (4 points) If the company operates 2 shifts per day, 8 hours per shift, and 5 days per week, the capacity of this production system = A/ units per week. Use 2-decimal accuracy for the final answer, e.g., 0.12, when necessary
Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access with AI-Powered Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started