Suppose that 15 components are sampled (n = 15) from a very large lot of components that have just been received. Assume that management decides
- Suppose that 15 components are sampled (n = 15) from a very large lot of components that have just been received. Assume that management decides to accept the lot only if no more than two nonconforming items are found in the sample; that is, c = 2. Although we do not have the actual percentage of nonconforming components in the lot, let us assume that this value is 5%. What is the probability that the lot will be accepted using this particular sampling plan? What happens if c = 3?
b). Use the information above and develop the OC curve for n=15, c =2; and n =15, c =2. If AQL is 3% and LTPD is 15%, what will be the producer and consumer risks for the two sampling plans (n=15, c=2) and (n=15, c=2) to be appropriate?
I need answers shown in excel file.
Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started