Suppose that you have two possible projects. Project 1 gives a profit of 10 in period 0 and 9 in period 1. Project 2 gives
Suppose that you have two possible projects. Project 1 gives a profit of 10 in period 0 and 9 in period 1. Project 2 gives a profit of 12 in period 0 and 6.5 in period 1. Suppose that the interest rate r = 0.30. Which project is better? (Hint: no matter when you want to consume, higher PDV is always better.)
Project A or project B?