Question
= Suppose the average demand for Proven Special Electric Motors (PSEM) is 30 per day and the three workers in Jake and Dan's PSEM cell
= Suppose the average demand for Proven Special Electric Motors (PSEM) is 30 per day and the three workers in Jake and Dan's PSEM cell work eight hours per day. Then the required
cycle time to meet demand is
- 14 minutes per unts
- 15 to minutes per unit
- 16 min per unit
- 17 minutes per unit
- 18 minutes per unit
=. Jake and Dan reduced the average throughput time in the Proven Special Electric Motor
(PSEM) Department through all of the following means EXCEPT:
The waste of operators waiting to use the machine press was eliminated
The waste of operators having to search for missing tools was reduced.
c. Single-piece material handling was implemented.
d. Total work-in-process inventory was reduced
e. The production batch size was increased to 7,
= Jake and Dan's new cellular design increases operator capacity utilization through
a. reducing batch sizes
b. reducing inventories
c. balancing the workload reducing the number of operators
e. locating the machine press at workstation 1
Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started