Sweeten Company had no jobs in progress at the beginning of the year and no beginning inventories. It started, completed, and sold only two Jobs during the year-Job P and Job Q. The company uses a plantwide predetermined overhead rate based on machine-hours, At the beginning of the year, it estimated that 4,000 machine-hours would be required for the period's estimated level of production. Sweeten also estimated $28,600 of fixed manufacturing overhead cost for the coming period and varlable manufacturing overhead of $2.60 per machine-hour. Because Sweeten has two manufacturing departments-Molding and Fabrication-it is considering replacing its plantwide overhead rate with departmental rates that would also be based on machine-hours. The company gathered the following additional information to enable calculating departmental overhead rates: The direct materials cost, direct labor cost, and machine-hours used for Jobs P and Q are as follows: Sweeten Company had no overapplied or underapplled manufacturing overhead costs during the year. Required: For questions 1-8, assume that Sweeten Company uses a plantwide predetermined overhead rate with machine-hours as the allocation base. For questions, 9.15, assume that the company uses predetermined departmental overhead rates with machine-hours as the allocation base in both departments. oundational 2-4 (Algo) If Job P includes 20 units, what is its unit product cost? (Do not round intermediate calculations. Round your final answer to iearest whole dollar) 5. What is the total manufacturing cost assigned to Job Q? (Do not round intermediate calculations.) 6. If Job Q includes 30 units, what is its unit product cost? (Do not round intermediate calculations. Round nearest whole dollar.)