Sweeten Company had no jobs in progress at the beginning of March and no beginning inventories. The company has two manufacturing departments Molding and Fabrication. It started, completed, and sold only two jobs during March-Job P and Job Q. The following additional information is available for the company as a whole and for Jobs Panda (all data and questions relate to the month of March) Estimated total machine-hours used Estimated total fixed manufacturing overhead Estimated variable manufacturing overhead per machine-hour Molding Fabrication total 2,500 1,500 4,000 $15,000 $18,000 $33,000 53.40 $ 4.20 Job P $33,000 $37,000 lobo $18,000 $1,500 Direct materials Direct labor cost Actual machine hours used Molding Fabrication Total 2,800 3,700 2.600 6,309 2,900 5700 Sweeten Company had no underapplied or overapplied manufacturing overhead costs during the month, Required: For questions 18, assume that Sweeten Company uses a plantwide predetermined overhead rate with machine hours as the allocation base. For questions 9-15. assume that the company uses departmental predetermined overhead rates with machine-hours as the allocation base in both departments 5. What was the total manufacturing cost assigned to Job Q? (Do not round intermediate calculations.) Total manufacturing cost Sweeten Company had no jobs in progress at the beginning of March and no beginning inventories. The company has two manufacturing departments Molding and Fabrication. It started, completed, and sold only two jobs during March --Job P and Job Q. The following additional Information is available for the company as a whole and for Jobs P and (all data and questions relate to the month of March Estimated total wachine-hours used Estimated total fixed manufacturing overhead Estimated variable manufacturing overhead por machine-hour Molding Fabrication Total 2.500 1,500 4,000 $15,000 $18.900 $33,000 $ 3.40 $6.28 Top $3,000 $37.000 obo $18,000 $15.500 Direct materials Direct labor cost Actual machine-hours used: Molding Fabrication Total 3.700 2.000 26 IG, 2.900 5.200 Sweeten Company had no underapplied or overapplied manufacturing overhead costs during the month. Required: For questions 18 assume that Sweeten Company uses a plantwide predetermined overhead rate with machine hours as the allocation base. For questions 9-15. assume that the company uses departmental predetermined overhead rates with machine-hours as the allocation base in both departments 6.16 Job Included 30 units what was its unit product cost? (Do not round intermediate calculations. Round your final answer to nearest whole dollor.)