Answered step by step
Verified Expert Solution
Link Copied!

Question

1 Approved Answer

Sweeten Company had no jobs in progress at the beginning of the year and no beginning inventories. It started, completed, and sold only two jobs

image text in transcribed
image text in transcribed
image text in transcribed
image text in transcribed
Sweeten Company had no jobs in progress at the beginning of the year and no beginning inventories. It started, completed, and sold only two jobs during the year-Job P and Job Q. The company uses a plantwide predetermined overhead rate based on machine-hours. At the beginning of the year, it estimated that 4,000 machine-hours would be required for the period's estimated level of production. Sweeten also estimated $29,800 of fixed manufacturing overhead cost for the coming period and variable manufacturing overhead of $2.90 per machine-hour. Because Sweeten has two manufacturing departments --Molding and Fabrication-It is considering replacing its plantwide overhead rate with departmental rates that would also be based on machine-hours. The company gathered the following additional information to enable calculating departmental overhead rates: Molding Fabrication Total Estimated total machine-hours used 2,500 1,500 4,000 Estimated total fixed manufacturing overhead $ 13,000 $ 16,800 $ 29,800 Estimated variable manufacturing overhead per machine-hour $ 2.60 $ 3.40 The direct materials cost, direct labor cost, and machine-hours used for Jobs P and Q are as follows: Job P Job 0 Direct materials $ 25,000 $ 14,000 Direct labor cost $ 30,600 $ 12,300 Actual machine-hours used: Molding 2,900 2,000 Fabrication 1,800 2,100 Total 4,700 4,100 Sweeten Company had no overapplied or underapplied manufacturing overhead costs during the year. Required: For questions 1-8, assume that Sweeten Company uses a plantwide predetermined overhead rate with machine-hours as the allocation base. For questions, 9-15, assume that the company uses predetermined departmental overhead rates with machine-hours as the allocation base in both departments. > 29,000 codeU LULGL leu manu LLU ny uverneau > 13,00 > 10,000 Estimated variable manufacturing overhead per machine-hour $ 2.60 $ 3.40 The direct materials cost, direct labor cost, and machine hours used for Jobs P and Q are as follows: Job P Job O Direct materials $ 25,000 $ 14,000 Direct labor cost $ 30,600 $ 12,300 Actual machine-hours used: Molding 2,900 2,000 Fabrication 1,800 2,100 Total 4,700 4,100 Sweeten Company had no overapplied or underapplied manufacturing overhead costs during the year Required: For questions 1-8, assume that Sweeten Company uses a plantwide predetermined overhead rate with machine hours as the allocation base. For questions, 9-15, assume that the company uses predetermined departmental overhead rates with machine-hours as the allocation base in both departments Foundational 2-8 (Algo) 8. What is Sweeten Company's cost of goods sold for the year? (Do not round intermediate calculations.) Answer is complete but not entirely correct. Cost of goods sold $ 81,300 Return to Job P Job Direct materials $ 25,000 $ 14,000 Direct labor cost $ 30,600 $ 12,300 Actual machine-hours used: Molding 2,900 2.000 Fabrication 1,800 2,100 Total 4,700 4,200 Sweeten Company had no overapplied or underapplied manufacturing overhead costs during the year Required: For questions 1-8, assume that Sweeten Company uses a plantwide predetermined overhead rate with machine-hours as the allocation base. For questions, 9-15, assume that the company uses predetermined departmental overhead rates with machine-hours as the allocation base in both departments. Foundational 2-13 (Algo) 13. If Job includes 30 units, what is its unit product cost? (Do not round intermediate calculations. Round your final answer to nearest whole dollar.) Answer is complete but not entirely correct. Unit product cost 1.899 Job P $ 25,000 $ 30,600 Job 0 $ 14,000 $ 12,300 Direct materials Direct labor cost Actual machine-hours used: Molding Fabrication Total 2.900 1,800 4,700 2,800 2,100 4,100 Sweeten Company had no overapplied or underapplied manufacturing overhead costs during the year Required: For questions 1-8, assume that Sweeten Company uses a plantwide predetermined overhead rate with machine-hours as the allocation base. For questions, 9-15, assume that the company uses predetermined departmental overhead rates with machine-hours as the allocation base in both departments, Foundational 2-14 (Algo) 14. Assume that Sweeten Company uses cost-plus pricing and a markup percentage of 80% of total manufacturing cost) to establish selling prices for all of its jobs. If Job Pincludes 20 units and Job includes 30 units, what selling price would the company establish for Jobs P and Q? What are the selling prices for both jobs when stated on a per unit basis? (Do not round Intermediate calculations. Round your final answers to nearest whole dollar) Job P Job Total price for the job Selling price per unit

Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access with AI-Powered Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image

Step: 3

blur-text-image

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Recommended Textbook for

Entrepreneurship

Authors: Andrew Zacharakis, William D Bygrave

5th Edition

1119563097, 9781119563099

Students also viewed these Accounting questions