Sweeten Company had no jobs in progress at the beginning of the year and no beginning inventories. It started, completed, and sold only two jobs
Sweeten Company had no jobs in progress at the beginning of the year and no beginning inventories. It started, completed, and sold only two jobs during the yearJob P and Job Q. The company uses a plantwide predetermined overhead rate based on machine-hours. At the beginning of the year, it estimated that 4,000 machine-hours would be required for the periods estimated level of production. Sweeten also estimated $28,200 of fixed manufacturing overhead cost for the coming period and variable manufacturing overhead of $2.50 per machine-hour.
Because Sweeten has two manufacturing departmentsMolding and Fabricationit is considering replacing its plantwide overhead rate with departmental rates that would also be based on machine-hours. The company gathered the following additional information to enable calculating departmental overhead rates:
MoldingFabricationTotalEstimated total machine-hours used2,5001,5004,000Estimated total fixed manufacturing overhead$ 12,000$ 16,200$ 28,200Estimated variable manufacturing overhead per machine-hour$ 2.20$ 3.00The direct materials cost, direct labor cost, and machine-hours used for Jobs P and Q are as follows:
Job PJob QDirect materials$ 21,000$ 12,000Direct labor cost$ 27,400$ 10,700Actual machine-hours used:Molding2,5001,600Fabrication1,4001,700Total3,9003,300. What was the companys plantwide predetermined overhead rate? (Round your answer to 2 decimal places.)
2. How much manufacturing overhead was applied to Job P and how much was applied to Job Q? (Do not round intermediate calculations.)
3. What was the total manufacturing cost assigned to Job P? (Do not round intermediate calculations.)
4. If Job P included 20 units, what was its unit product cost? (Do not round intermediate calculations. Round your final answer to nearest whole dollar.)
5. What was the total manufacturing cost assigned to Job Q? (Do not round intermediate calculations.)
6. If Job Q included 30 units, what was its unit product cost? (Do not round intermediate calculations. Round your final answer to nearest whole dollar.)
7. Assume that Sweeten Company used cost-plus pricing (and a markup percentage of 80% of total manufacturing cost) to establish selling prices for all of its jobs. What selling price would the company have established for Jobs P and Q? What are the selling prices for both jobs when stated on a per unit basis assuming 20 units were produced for Job P and 30 units were produced for Job Q? (Do not round intermediate calculations. Round your final answers to nearest whole dollar.)
8. What was Sweeten Companys cost of goods sold for March? (Do not round intermediate calculations.)
9. What were the companys predetermined overhead rates in the Molding Department and the Fabrication Department? (Round your answers to 2 decimal places.)
10. How much manufacturing overhead was applied from the Molding Department to Job P and how much was applied to Job Q? (Do not round intermediate calculations.)
11. How much manufacturing overhead was applied from the Fabrication Department to Job P and how much was applied to Job Q? (Do not round intermediate calculations.)
12. If Job P included 20 units, what was its unit product cost? (Do not round intermediate calculations.)
13. If Job Q included 30 units, what was its unit product cost? (Do not round intermediate calculations. Round your final answer to nearest whole dollar.)
14. Assume that Sweeten Company used cost-plus pricing (and a markup percentage of 80% of total manufacturing cost) to establish selling prices for all of its jobs. What selling price would the company have established for Jobs P and Q? What are the selling prices for both jobs when stated on a per unit basis assuming 20 units were produced for Job P and 30 units were produced for Job Q? (Do not round intermediate calculations. Round your final answer to nearest whole dollar.)
15. What was Sweeten Companys cost of goods sold for March? (Do not round intermediate calculations.)
Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started