Question
Swifty Products manufactures two component parts: AJ40 and AJ60. AJ40 components are being introduced currently, and AJ60 parts have been in production for several years.
Swifty Products manufactures two component parts: AJ40 and AJ60. AJ40 components are being introduced currently, and AJ60 parts have been in production for several years. For the upcoming period, 1,400 units of each product are planned for manufacturing. Assume that the only relevant overhead cost is for engineering change orders (any requested changes in product design or the manufacturing process). AJ40 components are expected to require 4 change orders and AJ60 only 2. Each AJ40 requires 1 machine hour, and each AJ60 requires 1.5 machine hours. The cost of a change order is $400.
1) Estimate the cost of engineering change orders for AJ40 and AJ60 components if Swifty uses a traditional costing method and machine hours as the allocation base.
2)Now suppose that Swifty uses an ABC system and allocates the cost of change orders by using as cost driver the number of change orders. Estimate the cost for change orders for each unit of AJ40 and AJ60.
3)Calculate the difference in overhead allocated to each product.
Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started