Taveras Corporation is currently operating at 50% of its available manufacturing capacity, It uses a job-order costing system with a plantwide predetermined overhead rate based on machine-hours. At the beginning of the year, the company made the following estimates: Machine-hours required to support estimated production Pixed manufacturing overhead cost Variable manufacturing overhead cont per machine-hour 235,000 $ 1,760,000 $ 2.00 Required: 1. Compute the plantwide predetermined overhead rate. 2. During the year, Job R90 was started, completed, and sold to the customer for $3,900. The following information was available with respect to this job: Direct materials Direct labor cost Machine-hours used 3.1,794 $ 1.287 Compute the total manufacturing cost assigned to Job P90. Complete this question by entering your answers in the tabs below. Required 1 Required a Compute the plantwide predetermined overhead rate. Predam overheatre per MH Required >> Taveras Corporation is currently operating at 50% of its available manufacturing capacity. It uses a job-order costin plantwide predetermined overhead rate based on machine-hours. At the beginning of the year, the company made estimates: Machine-hours required to support estimated production Fixed manufacturing overhead cost Variable manufacturing overhead cost per machine-hour 235,000 $ 3,760,000 $ 2.00 Required: 1. Compute the plantwide predetermined overhead rate. 2. During the year, Job R90 was started, completed, and sold to the customer for $3,900. The following information respect to this job: Direct materials Direct labor cost Machine-hours used $ 1,794 $ 1,287 86 Compute the total manufacturing cost assigned to Job P90. Complete this question by entering your answers in the tabs below. Required 1 Required 2 During the year, Job P90 was started, completed and sold to the customer for $3,900. Compute the total manufacturing assigned to Job P90. Direct materials Direct labor Overhead applied Total manufacturing cost