Teldar Manufacturing Company is a diversified manufacturer that manufactures three products (M5, Z4, and I8) in a continuous production process. Senior management has asked the
Teldar Manufacturing Company is a diversified manufacturer that manufactures three products (M5, Z4, and I8) in a continuous production process. Senior management has asked the controller to conduct an activity-based costing study. The controller identified the amount of factory overhead required by the critical activities of the organization as follows:
1 | Activity | Activity Cost Pool |
2 | Production | $251,598.00 |
3 | Setup | 92,035.00 |
4 | Material handling | 10,736.00 |
5 | Inspection | 49,833.00 |
6 | Product engineering | 136,230.00 |
7 | Total | $540,432.00 |
The activity bases identified for each activity are as follows:
Activity | Activity Base |
---|---|
Production | Machine hours |
Setup | Number of setups |
Material handling | Number of parts |
Inspection | Number of inspection hours |
Product engineering | Number of engineering hours |
The activity-base usage quantities and units produced for the three products were determined from corporate records and are as follows:
Machine | Number of | Number of | Number of | Number of | ||
Hours | Setups | Parts | Inspection Hours | Engineering Hours | Units | |
M5 | 970 | 63 | 84 | 489 | 123 | 1,354 |
Z4 | 802 | 123 | 138 | 272 | 170 | 1,044 |
I8 | 435 | 209 | 266 | 256 | 185 | 452 |
Total | 2,207 | 395 | 488 | 1,017 | 478 | 2,850 |
Each product requires 0.72 machine hour per unit.
Required: | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Complete the Activity Tables for M5, Z4 and I8.
|
Required: | |||||||
Complete the Activity Table for Z4.
|
Z4 | |||||
Activity | Activity- | ||||
Base | Activity | Activity | |||
Usage | X | Rate | = | Cost | |
Production | |||||
Setup | |||||
Material handling | |||||
Inspection | |||||
Engineering | |||||
Total activity cost | |||||
Number of units | |||||
Activity cost per unit |
Required: | |||||||
Complete the Activity Table for I8.
|
I8 | |||||
Activity | Activity- | ||||
Base | Activity | Activity | |||
Usage | X | Rate | = | Cost | |
Production | |||||
Setup | |||||
Material handling | |||||
Inspection | |||||
Engineering | |||||
Total activity cost | |||||
Number of units | |||||
Activity cost per unit |
Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started