Thames Engineering performs cement core tests in its laboratory. The following standards have been set for each core test performed: Standard Hours or Quantity Standard
Thames Engineering performs cement core tests in its laboratory. The following standards have been set for each core test performed:
Standard Hours or Quantity | Standard Price or Rate | |
Direct Materials | 3 pounds | $0.75 per pound |
Direct Labor | 0.4 hours | $12 per hour |
Variable Manufacturing Overhead | 0.4 hours | $9 per hour |
During March, the laboratory performed 2,000 core tests. On March 1 no direct materials (sand) were on hand. Variable manufacturing overhead is assigned to core tests on the basis of standard direct labor-hours. The following events occurred during March: 8,600 pounds of sand were purchased at a cost of $7,310. 7,200 pounds of sand were used for core tests. 840 actual direct labor-hours were worked at a cost of $8,610. Actual variable manufacturing overhead incurred was $3,200.
The materials price variance for March is:
A. $860 unfavorable B. $860 favorable C. $281 unfavorable D. $281 favorable
The materials quantity variance for March is: A. $900 favorable B. $1,950 favorable C. $1,950 unfavorable D. $900 unfavorable
Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started