Answered step by step
Verified Expert Solution
Question
1 Approved Answer
The Allbright BrickWorks, in Winnipeg, manufactures high-quality bricks used in residential and commercial construction. The firm is small but highly automated and typically produces about
The Allbright BrickWorks, in Winnipeg, manufactures high-quality bricks used in residential and commercial construction. The firm is small but highly automated and typically produces about 300,000 bricks per month. A brick is created in a continuous production operation. In the initial step, the raw material, a mixture of soils and water, is forced into a brick mould moving along a conveyer belt. No other materials are required in the manufacture of a brick. Each brick takes about three days to complete. They spend the last 36 hours or so on the conveyor belt in an oven that removes moisture from the product. The conveyor belt speed is monitored and controlled by computer. The firm uses a process costing system based on actual costs in three cost pools-direct materials, direct labour, and factory overhead-to assign production costs to output. Cost and production data for October 2020 follow: Production Data Beginning work in process inventory (100% complete in terms of direct materials; 60% complete in terms of direct labour; 36% complete in terms of factory overhead) Started this period Ending work in process inventory (100% complete in terms of direct materials; 50% complete in terms of direct labour; 40% complete in terms of factory overhead) 35,000 bricks 291,300 bricks 34,400 bricks Cost Data Materials $1,380 11,652 Beginning inventory Cost in October Direct Labour Overhead $470 $900 14,405 14,653 Determine the cost of bricks transferred to finished goods inventory and the cost of bricks in ending work in process inventory for October 2020. Assume the company uses the FIFO method. (Round answers to the nearest whole dollar, e.g. 5,275. Round per unit costs to the 4 decimal places, e.g. 15.2512.) Cost of bricks transferred to finished goods inventory Cost of bricks in ending work in process inventory
Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started