The Browns Ferry Nuclear Plant, a Tennessee Valley Authority (TVA) operated facility, is located in Athens, Alabama. Browns Ferry Unit 1 uses a General Electric
The Browns Ferry Nuclear Plant, a Tennessee Valley Authority (TVA) operated facility, is located in Athens, Alabama. Browns Ferry Unit 1 uses a General Electric Mark 1 boiling water reactor. (Use the following link for a diagram of a Boiling Water Reactor.)
perform calculations based on a postulated accident.
- For the postulated accident, perform a RASCAL analysis using the input data below. What protective action advice should be given based on the doses calculated?
- Using the exact input, but changing the release pathway term to the wet well, how do the calculated results change? Explain this difference, if any.
Source Term
Type: Time Core Is Uncovered
Shutdown: 2015/11/09 07:30
Core uncovered: 2015/11/09 10:00
Core recovered: No
Release Pathway
Type: BWR - Release through Dry Well
via Direct, Unfiltered Pathway
Release height: 10 m
Release events
2015/11/09 10:00 Leak Rate (% Vol) Design
2015/11/09 10:00 Sprays Off
Meteorology
Actual Observations:
Time | Wind Direction | Wind Speed | Stability Class | Precipitation |
8:15 | 25 | 12 | A | No Rain |
8:30 | 23 | 12 | A | No Rain |
8:45 | 24 | 11 | A | No Rain |
Calculated projections should terminate 8 hours after the events has occurred (18:00 hours).
Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started