The builders of the 407 extension to Waterloo have two options for building the highway: Asphalt costs $20,000,000 per kilometer to build and needs a

The builders of the 407 extension to Waterloo have two options for building the highway: Asphalt costs $20,000,000 per kilometer to build and needs a major reconstruction every 7 years at the same $20 million cost per kilometer; Concrete cost more per kilometer to build ($30,000,000), but lasts 15 years before needing a major reconstruction at $30 million per kilometer. Use a 10% cost of capital. Required:

(a) If the highway is provincially owned, and therefore not taxable, how should the highway be built? (5 marks)

(b) If a private-sector company owns the highway, paying tax at 40%, which material should be used if the CCA rate for the concrete highway is 10% and the CCA rate for the asphalt highway is 15%? (5 marks)

Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access with AI-Powered Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image

Step: 3

blur-text-image

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Students also viewed these Finance questions