Question
The builders of the 407 extension to Waterloo have two options for building the highway: Asphalt costs $20,000,000 per kilometer to build and needs a
The builders of the 407 extension to Waterloo have two options for building the highway: Asphalt costs $20,000,000 per kilometer to build and needs a major reconstruction every 7 years at the same $20 million cost per kilometer; Concrete cost more per kilometer to build ($30,000,000), but lasts 15 years before needing a major reconstruction at $30 million per kilometer. Use a 10% cost of capital. Required:
(a) If the highway is provincially owned, and therefore not taxable, how should the highway be built? (5 marks)
(b) If a private-sector company owns the highway, paying tax at 40%, which material should be used if the CCA rate for the concrete highway is 10% and the CCA rate for the asphalt highway is 15%? (5 marks)
Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started