Question
The Camino Real Landfill was required to install a plastic liner to prevent leachate from migrating into the groundwater. The fill area was 46,000 m2
The Camino Real Landfill was required to install a plastic liner to prevent leachate from migrating into the groundwater. The fill area was 46,000 m2 and the installed liner cost was $8 per m2. In order to recover the investment, the owner charges to unload at the rates of $16 per pickup, $25 per dump truck, and $70 per compactor truck load. The fill area is adequate for 7 years. If the annual traffic is estimated to be 2500 pickup loads, 650 dump-truck loads, and 1200 compactor-truck loads, what rate of return will the landfill owner make on the investment?
The rate of return that will be made by the landfill owner is ___ % per year
Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started