Answered step by step
Verified Expert Solution
Link Copied!

Question

1 Approved Answer

1. The Chair of the Operations Management Department at Quality University wants to construct a p-chart for determining whether the four faculty teaching the basic

1. The Chair of the Operations Management Department at Quality University wants to construct a p-chart for determining whether the four faculty teaching the basic P/OM course are under control with regard to the number of students who fail the course. Accordingly, he sampled 100 final grades from last year for each instructor, with the following results: What is the estimate of the mean proportion of failures for these instructors?

INSTRUCTOR

NUMBER OF FAILURES

Prof. A

13

Prof. B

0

Prof. C

11

Prof. D

16


Select one:

A. .16

B. .40

C. .11

D. .13

E. .10

2. The Chair of the Operations Management Department at Quality University wants to construct a p-chart for determining whether the four faculty teaching the basic P/OM course are under control with regard to the number of students who fail the course. Accordingly, he sampled 100 final grades from last year for each instructor, with the following results: What is the estimate of the standard deviation of the sampling distribution for an instructor's sample proportion of failures?

INSTRUCTOR

NUMBER OF FAILURES

Prof. A

13

Prof. B

0

Prof. C

11

Prof. D

16


Select one:

A. .3

B. .075

C. .03

D. .75

E. .0075

3. The Chair of the Operations Management Department at Quality University wants to construct a p-chart for determining whether the four faculty teaching the basic P/OM course are under control with regard to the number of students who fail the course. Accordingly, he sampled 100 final grades from last year for each instructor, with the following results: What are the .95 (5% risk of Type I error) upper and lower control limits for the p-chart?

INSTRUCTOR

NUMBER OF FAILURES

Prof. A

13

Prof. B

0

Prof. C

11

Prof. D

16


Select one:

A. .1774 and .0226

B. .1588 and .0412

C. .16 and .04

D. .13 and .07

E. .95 and .05


4. The Chair of the Operations Management Department at Quality University wants to construct a p-chart for determining whether the four faculty teaching the basic P/OM course are under control with regard to the number of students who fail the course. Accordingly, he sampled 100 final grades from last year for each instructor, with the following results: Using .95 control limits, (5% risk of Type I error), which instructor(s), if any, should he conclude is (are) out of control?

INSTRUCTOR

NUMBER OF FAILURES

Prof. A

13

Prof. B

0

Prof. C

11

Prof. D

16


Select one:

A. both Prof. B and Prof. D

B. all

C. Prof. B

D. none

E. Prof. D

Step by Step Solution

3.48 Rating (158 Votes )

There are 3 Steps involved in it

Step: 1

4 Follow the steps mentioned below to construct the p chart 1Import the data to Minit... blur-text-image

Get Instant Access to Expert-Tailored Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image

Step: 3

blur-text-image

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Recommended Textbook for

Accounting concepts and applications

Authors: Albrecht Stice, Stice Swain

11th Edition

978-0538750196, 538745487, 538750197, 978-0538745482

More Books

Students also viewed these Accounting questions

Question

=+b) Would you use this model? Explain.

Answered: 1 week ago

Question

What pay system do you prefer? Why is this your preference?

Answered: 1 week ago