Question
1. The Chair of the Operations Management Department at Quality University wants to construct a p-chart for determining whether the four faculty teaching the basic
1. The Chair of the Operations Management Department at Quality University wants to construct a p-chart for determining whether the four faculty teaching the basic P/OM course are under control with regard to the number of students who fail the course. Accordingly, he sampled 100 final grades from last year for each instructor, with the following results: What is the estimate of the mean proportion of failures for these instructors?
INSTRUCTOR | NUMBER OF FAILURES |
Prof. A | 13 |
Prof. B | 0 |
Prof. C | 11 |
Prof. D | 16 |
Select one:
A. .16
B. .40
C. .11
D. .13
E. .10
2. The Chair of the Operations Management Department at Quality University wants to construct a p-chart for determining whether the four faculty teaching the basic P/OM course are under control with regard to the number of students who fail the course. Accordingly, he sampled 100 final grades from last year for each instructor, with the following results: What is the estimate of the standard deviation of the sampling distribution for an instructor's sample proportion of failures?
INSTRUCTOR | NUMBER OF FAILURES |
Prof. A | 13 |
Prof. B | 0 |
Prof. C | 11 |
Prof. D | 16 |
Select one:
A. .3
B. .075
C. .03
D. .75
E. .0075
3. The Chair of the Operations Management Department at Quality University wants to construct a p-chart for determining whether the four faculty teaching the basic P/OM course are under control with regard to the number of students who fail the course. Accordingly, he sampled 100 final grades from last year for each instructor, with the following results: What are the .95 (5% risk of Type I error) upper and lower control limits for the p-chart?
INSTRUCTOR | NUMBER OF FAILURES |
Prof. A | 13 |
Prof. B | 0 |
Prof. C | 11 |
Prof. D | 16 |
Select one:
A. .1774 and .0226
B. .1588 and .0412
C. .16 and .04
D. .13 and .07
E. .95 and .05
4. The Chair of the Operations Management Department at Quality University wants to construct a p-chart for determining whether the four faculty teaching the basic P/OM course are under control with regard to the number of students who fail the course. Accordingly, he sampled 100 final grades from last year for each instructor, with the following results: Using .95 control limits, (5% risk of Type I error), which instructor(s), if any, should he conclude is (are) out of control?
INSTRUCTOR | NUMBER OF FAILURES |
Prof. A | 13 |
Prof. B | 0 |
Prof. C | 11 |
Prof. D | 16 |
Select one:
A. both Prof. B and Prof. D
B. all
C. Prof. B
D. none
E. Prof. D
Step by Step Solution
3.48 Rating (158 Votes )
There are 3 Steps involved in it
Step: 1
4 Follow the steps mentioned below to construct the p chart 1Import the data to Minit...Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started