The constraint at Vrana Inc. is an expensive milling machine. The throe products listed below use this constrained resource. Prepare a schedule to determine the
The constraint at Vrana Inc. is an expensive milling machine. The throe products listed below use this constrained resource. Prepare a schedule to determine the rank of each of the products, then answer the following questions by electing the correct answer from the drop-down box. A. $12.79 B. 2680 C. $165.80 D. $121.47 E. $767.18 F. $26.53 G. #1 - DF; #2 - JH; #3 - KW H. $89.58 I. $15.58