Question
The construction crew for a new store will dig a hole in the shape of a rectangular prism for the store's foundation. The will
The construction crew for a new store will dig a hole in the shape of a rectangular prism for the store's foundation. The will be 17 yd long, 14 yd wide, and 4 yd deep. To haul away all of the dirt from the hole, a dump truck will take trips to a nearby landfill. The crew knows the amount of dirt the truck can hold each trip in cubic feet. (a) Find the volume of dirt that will be hauled away in cubic feet. Use the table of conversion facts, as needed. Conversion facts for length 1 foot (ft) 12 inches (in) 1 yard (yd) 3 feet (ft) 1 yard (yd) 36 inches (in) (b) Each trip, the truck can haul away 310 ft of dirt. To save gas, the crew wants to take as few trips as necessary to haul all of the dirt away. Since all of the dirt needs to be hauled away, the crew might have to take a partial load for one trip. How many trips are needed to haul away all of the dirt? Count each trip it makes the same, even if the truck isn't full. trips (c) If it costs $1225 for each trip that the truck makes, how much will it cost to haul away all the dirt? $
Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access with AI-Powered Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started