Answered step by step
Verified Expert Solution
Link Copied!

Question

1 Approved Answer

The costs associated with the electrical consumption of the console system are the following: The cost of electricity consumption for the complete console system is

image text in transcribed

image text in transcribed

The costs associated with the electrical consumption of the console system are the following: The cost of electricity consumption for the complete console system is $ 175 per day, 12 hours per day. Assume that the system will operate for 260 business days annually. Perform a present value analysis to select the best alternative A. Consider that the replacements will be for identical units B. The residual value of the equipment corresponds to the cost of disposal of the unit C. Analyze a 30-year horizon D. Consider an interest rate of 6% installation of a system of individual units consisting of four capacitors and 41 consoles The initial costs are as follows: Cost item Unit Cost Units Total Cost Useful Life Condenser MDV 400 $9,000 2 6 years Condenser MDV 450 2 6 years $9,700 $700 Consoles 12,000 BTU 31 6 years Consoles 19,000 BTU $900 10 6 years n/a Materials*** $35,000 $18,000 Labor for installation n/a concept **** *** Includes materials for the insulation system. The cost of materials for the replacement of the consoles is obviated **** Replacement labor is reduced to 80% of original cost. System maintenance consists of: Maintenance work Unidades Personnel requirements Labor Duration 1.5 hours Monthly Salary $1,550 $1,515 Cost of Piece Replacement $30/unit 41 1 technician 1 assistant 4 1 hour Console cleaning and filter replacement once a year Condenser cleaning once a year Console extraction pump replacement, every 3 years 1 technician 1 assistant $1,550 $1,515 41 4 day $50/unit 1 technician 1 assistant 1 technician 1 assistant Maintenance is carried out by personnel from the Refrigeration Workshop assigned to the Department of Buildings and Land of the land. The total hours that a regular employee works in the Campus is 1,950 hours per year, at a rate of 7.5 hours per day. (They will need to calculate the cost associated with the time staff spend on maintenance tasks for this particular equipment.) The additional costs associated with the operation of the console system are as follows: Cost Item Costs Frequency Every 12 years $12,000 Refrigerant Pipe Insulation Replacement The costs associated with the electrical consumption of the console system are the following: The cost of electricity consumption for the complete console system is $ 175 per day, 12 hours per day. Assume that the system will operate for 260 business days annually. Perform a present value analysis to select the best alternative A. Consider that the replacements will be for identical units B. The residual value of the equipment corresponds to the cost of disposal of the unit C. Analyze a 30-year horizon D. Consider an interest rate of 6% installation of a system of individual units consisting of four capacitors and 41 consoles The initial costs are as follows: Cost item Unit Cost Units Total Cost Useful Life Condenser MDV 400 $9,000 2 6 years Condenser MDV 450 2 6 years $9,700 $700 Consoles 12,000 BTU 31 6 years Consoles 19,000 BTU $900 10 6 years n/a Materials*** $35,000 $18,000 Labor for installation n/a concept **** *** Includes materials for the insulation system. The cost of materials for the replacement of the consoles is obviated **** Replacement labor is reduced to 80% of original cost. System maintenance consists of: Maintenance work Unidades Personnel requirements Labor Duration 1.5 hours Monthly Salary $1,550 $1,515 Cost of Piece Replacement $30/unit 41 1 technician 1 assistant 4 1 hour Console cleaning and filter replacement once a year Condenser cleaning once a year Console extraction pump replacement, every 3 years 1 technician 1 assistant $1,550 $1,515 41 4 day $50/unit 1 technician 1 assistant 1 technician 1 assistant Maintenance is carried out by personnel from the Refrigeration Workshop assigned to the Department of Buildings and Land of the land. The total hours that a regular employee works in the Campus is 1,950 hours per year, at a rate of 7.5 hours per day. (They will need to calculate the cost associated with the time staff spend on maintenance tasks for this particular equipment.) The additional costs associated with the operation of the console system are as follows: Cost Item Costs Frequency Every 12 years $12,000 Refrigerant Pipe Insulation Replacement

Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access to Expert-Tailored Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image

Step: 3

blur-text-image

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Recommended Textbook for

Healthcare Finance An Introduction To Accounting And Financial Management

Authors: Louis Gapenski PhD

3rd Edition

1567932320, 978-1567932324

More Books

Students also viewed these Finance questions

Question

List the steps of problem solving.

Answered: 1 week ago

Question

Describe specific developments that advanced cognitive psychology.

Answered: 1 week ago

Question

What is the average age of members of your key public?

Answered: 1 week ago

Question

How likely is this public to act on information it receives?

Answered: 1 week ago

Question

What does this public think about your organization?

Answered: 1 week ago