Answered step by step
Verified Expert Solution
Link Copied!

Question

1 Approved Answer

The cylinder C is raised by the hoist motor at A. The pinion of the motor drives gear B which is attached to the

image

The cylinder C is raised by the hoist motor at A. The pinion of the motor drives gear B which is attached to the hoisting drum D and rotates on the same shaft. The motor accelerates from rest with a constant angular acceleration A=2.0 rad/s. (a) Determine the time required to raise the load C 1.8 metres. What are the angular velocities of pinion A and gear B at this time and the magnitude of the acceleration of point P' on the hoisting drum D? (b) The motor is turned off once the load C has been raised 1.8 metres and the pinion decelerates according to A=-1.8t-1/2 Determine the time required for the system to come to rest and the number of revolutions pinion A rotates while decelerating. 75 mm B A P 225 mm 125 mm

Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access to Expert-Tailored Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image_2

Step: 3

blur-text-image_3

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Recommended Textbook for

Shigleys Mechanical Engineering Design

Authors: Richard G. Budynas, J. Keith Nisbett

9th edition

77679520, 73529281, 1259986241, 978-0077679521, 9780073529288, 9781259986246, 978-1121345317

More Books

Students also viewed these Mechanical Engineering questions