The design and execution of qualification tests themselves are normally dictated in the contract. That usually includes consideration of which of the following things? Each
The design and execution of qualification tests themselves are normally dictated in the contract. That usually includes consideration of which of the following things? Each correct answer represents a complete solution. Choose all that apply. A option A Requisite load limits B option B Requisite performance levels C option C Test cases to address questions D option D Number and types of load tests