Question
1 Approved Answer
The design of a concrete mix using the volumetric method requires 1145 kg/m of gravel in dry condition, 726 kg/m of sand in dry condition,
The design of a concrete mix using the volumetric method requires 1145 kg/m of gravel in dry condition, 726 kg/m of sand in dry condition, and 141 kg/m of free water. The gravel available at the job site has a total moisture content of 1.7% including absorption of 0.5%, and the available sand has a total moisture content of 1.9% including absorption of 0.4%. Determine the masses of gravel, sand, and water per cubic meter that should be used at the job site?
Step by Step Solution
There are 3 Steps involved in it
Step: 1
Lets break down the problem stepbystep Given Gravel 1145 kgm dry condition Sand 726 kgm dry conditio...Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started