The deterministic approach to estimates determines the estimate by __________. calculating the estimated time + 4 times the most likely time + the pessimistic time)
The deterministic approach to estimates determines the estimate by __________. calculating the estimated time + 4 times the most likely time + the pessimistic time) / 6 an average of three estimates establishing a single standard time estimate assuming that everything will line up correctly with nothing going wrong