The difference between the upper specification and the lower specification for a process is 0.70. The standard deviation is 0.05. Based on the given
The difference between the upper specification and the lower specification for a process is 0.70. The standard deviation is 0.05. Based on the given information, the process capability ratio, Cp = (round your response to two decimal places).