Answered step by step
Verified Expert Solution
Link Copied!

Question

1 Approved Answer

The Electrocomp Corporation manufactures two electrical products: air conditioners and large fans. The assembly process for each is similar in that both require a certain

The Electrocomp Corporation manufactures two electrical products: air conditioners and large fans. The assembly process for each is similar in that both require a certain amount of wiring and drilling. Each air conditioner takes 3 hours of wiring and 2 hours of drilling. Each fan must go through 2 hours of wiring and 1 hour of drilling. During the next production period, 240 hours of wiring time are available and up to 140 hours of drilling time may be used. Each air conditioner sold yields a profit of $25. Each fan assembled may be sold for a $15 profit.

Now, Electrocomps management also realizes that there should be a minimum number of air conditioners produced in order to fulfill a contract. Also, due to an oversupply of fans in the preceding period, a limit should be placed on the total number of fans produced.

1. If Electrocomp decides that at least 20 air conditioners should be produced but no more than 80 fans should be produced, the optimal production mix of air conditioners and fans is __________. (The first number is for air conditioners and the second for fans.)

A. (50,30)

B. (20,80)

C. (40,60)

D. (26.67,80)

2. In the optimal solution for the above question (Question 1), the slack for the four constrains Total hours of wiring, Total hours of drilling, Number of air conditioners, Number of fans are __________, respectively. (Hint: A negative number shows that the constraint is binding downward, i.e. it sets a lower rather than an upper limit. You may take the negative sign out when interpreting the results.)

A. 0, 0, 20, 20

B. 0, 0, 10, 20

C. 0, 0, 20, 10

D. 10, 10, 10, 10

3. If Electrocomp decides that at least 30 air conditioners should be produced but no more than 50 fans should be produced, the optimal production of air conditioners is ______ and the optimal production of fans is _______ . (Please only enter an integer and include no units.)

4. In the optimal solution for the above question (Question 3), the slack for the four constrains Total hours of wiring, Total hours of drilling, Number of air conditioners, Number of fans are __________, respectively. (Hint: A negative number shows that the constraint is binding downward, i.e. it sets a lower rather than an upper limit. You may take the negative sign out when interpreting the results.)

A. 0, 0, 15, 10

B. 5, 0, 15, 0

C. 0, 5, 15, 0

D. 0, 0, 10, 15

Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access to Expert-Tailored Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image

Step: 3

blur-text-image

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Recommended Textbook for

Financial Management For Public Health And Not For Profit Organizations

Authors: Steven A. Finkler

1st Edition

0130176141, 9780130176141

More Books

Students also viewed these Finance questions

Question

Write a program to check an input year is leap or not.

Answered: 1 week ago

Question

Write short notes on departmentation.

Answered: 1 week ago

Question

What are the factors affecting organisation structure?

Answered: 1 week ago

Question

What are the features of Management?

Answered: 1 week ago

Question

Briefly explain the advantages of 'Management by Objectives'

Answered: 1 week ago

Question

3. Raster images for screen projects need to be 72 dpi to scale.

Answered: 1 week ago