The Engineering School of a small Australian university is getting a new building. It has two floors; the building s architecture has been approved and
The Engineering School of a small Australian university is getting a new building. It has two floors; the buildings architecture has been approved and the builders are about to start. The building is expected to be operational within six to twelve months.
On the Ground floor there are eightlabs a common area, anda lecture theatre. The stfloor has administrative and academic offices, shared offices for postgraduate students and other research staff, andtwo specialised research labs. While the walls, floorand ceilings surfacesare being completed, subcontractors will install all networking cables according to layout specifications provided by the Universitys IT Service Centre, the architects firm and structural engineers from the building company.
Then, office furniture and equipment will be delivered, and all areas will be fitted out.
Simplified drawings of the architects' plans are provided in the document below "Floor plans and other materials"also linked here Some information about the build and layout:
Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started