The first operator on each line assembled the cabinet and fused the parts of the cabinet together using an ultrasonic welder. One operator could assemble
The first operator on each line assembled the cabinet and fused the parts of the cabinet together using an
ultrasonic welder. One operator could assemble and weld nine cabinets per hour. The second operator
assembled the door for Parcel Guard. The door featured a complicated design, and a skilled operator could
complete one door subassembly in minutes. The third operator installed the wiring harness and door
subassembly. Installing both the wiring harness and door subassembly took minutes. The fourth
operator completed the wiring by connecting the power supply to the lock mechanism, siren, load cells, and
main control panel. One operator could install the various electrical components and complete the wiring
for units in one hour. The fifth operator was responsible for the final inspection as well as testing the
electrical functions of Parcel Guard. The inspection took no more than seconds, and the electrical test
was automated through a dedicated software program designed to put Parcel Guard through a number of
authentication procedures. The electrical test took a total of minutes, including the labour to initiate the
test procedure and read the results. The technician could test three Parcel Guards at one time. The sixth and
final operation was packaging. One operator took a total of five minutes to package one unit; it then took
four minutes to stack six packaged Parcel Guards onto a pallet and prepare the pallet for shipping
Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started