The following is a partially completed performance report for Water Land volume of units on which...
Fantastic news! We've Found the answer you've been seeking!
Question:
![image text in transcribed](https://s3.amazonaws.com/si.experts.images/answers/2024/06/665be1e1088a7_632665be1e0929df.jpg)
![image text in transcribed](https://s3.amazonaws.com/si.experts.images/answers/2024/06/665be1e1a583a_633665be1e143c34.jpg)
![image text in transcribed](https://s3.amazonaws.com/si.experts.images/answers/2024/06/665be1e249e84_633665be1e1e048b.jpg)
Transcribed Image Text:
The following is a partially completed performance report for Water Land volume of units on which they are based Therefore, the volume variance is caused by differences between actual and expected volume 8. Fill in the missing numbers in the performance report. Be sure to indicate whether variances are favorable (F) or unfavorable (U) (Enter the variances as positive numbers. Label each variance as favorable (F) or unfavorable (U). If the variance is 0, make sure to enter in a "0" A variance of zero is considered favorable) Water Land Flexible Budget Performance Report: Sales and Operating Expenses For the Year Ended April 30 Flexible Budget Actual Variance Output units (pools installed) 5 Sales revenue $ 110,000 Operating expenses Variable expenses 58,000 Fixed expenses 23,000 Total operating expenses Flexible Budget Volume Variance Master Budget 4 $ 115,000 92,000 61,000 48,800 27.000 27,000 The following is a partially completed performance report for Water Land volume of units on which they are based Therefore, the volume variance is caused by differences between actual and expected volume 8. Fill in the missing numbers in the performance report. Be sure to indicate whether variances are favorable (F) or unfavorable (U) (Enter the variances as positive numbers. Label each variance as favorable (F) or unfavorable (U). If the variance is 0, make sure to enter in a "0" A variance of zero is considered favorable) Water Land Flexible Budget Performance Report: Sales and Operating Expenses For the Year Ended April 30 Flexible Budget Actual Variance Output units (pools installed) 5 Sales revenue $ 110,000 Operating expenses Variable expenses 58,000 Fixed expenses 23,000 Total operating expenses Flexible Budget Volume Variance Master Budget 4 $ 115,000 92,000 61,000 48,800 27.000 27,000
Expert Answer:
Posted Date:
Students also viewed these accounting questions
-
What is the difference between the par value and the call price of a share of preferred stock?
-
The pharmacist at Arnold Palmer Hospital, Saad Alwan receives 12 requests for prescriptions each hour, Poisson distributed. It takes him a mean time of 4 minutes to fill each, following a negative...
-
11-5A Razz Corporations common stock is currently selling on a stock exchange at $170 per share, and its current balance sheet shows the following stockholders equity section. Preferred stock 5%...
-
Briefly highlight on the concept of access control mechanism as used in computer security.
-
What causes each of these types of risks to be large or small? Explain why the degree of risk changes with the various entry modes. How would you address the idea that because of increasing risk,...
-
-Identify three external and three internal risks in a Large 500 room hotel situated in Sydney -You are working as a Manager in a 200 seat restaurant at Circular Quay. Discuss how you would Manage...
-
.What would you consider to be acceptable risks within your community? How did you determine the acceptable risks within your community?
-
NH CableSource purchased a depreciable asset on January 1, 2013 at a cost of $500,000. The asset is expected to have a salvage value of $75,000 at the end of its five-year useful life.The asset will...
-
A corporation plans on building a maximum of 11 new stores in a city. They will build these stores in one of three sizes for each location - a convenience store (open 24 hours), standard store, and...
-
P8-12. Two-Variance Overhead AnalysisThe standard specifications for an electric motor manufacturedby XYZ Electric Co. follow:Factory overhead rates are based on a normal 70% capacity anduse the 2...
-
If the actual closure of a project becomes a project in itself, what are the characteristics of this project? How is it different from other projects? LO2
-
What are the tasks involved for the PO when attempting to obtain the benefits desired from the project? LO2
-
What elements of the closure process may be responsible for making a project unsuccessful? LO2