The following steps are involved with PERT and CPM: Question 1 options: Arrange these jobs/tasks into a logical network. All of the above Determine duration
The following steps are involved with PERT and CPM: Question 1 options: Arrange these jobs/tasks into a logical network. All of the above Determine duration time of each job/task. Break a project into individual jobs or tasks