The following table shows chainage and corresponding cut and fill for a proposed road construction. Determine (a) each section's excess cut or shortfall (b)
The following table shows chainage and corresponding cut and fill for a proposed road construction. Determine (a) each section's excess cut or shortfall (b) the most efficient equipment for cut, fill and hauling assuming there is no rock present (c) draw the mass haul diagram and indicate cut, fill, excess cut or shortfall fill Costs are listed below: Dig and form banks up to 200m haul, $0.9 per m; Dig and form banks between 200m and 300m haul, $2.4 per m; Dig and form banks between 300m and 400m haul, $4.8 per m; Cart to tip, $1.5 per m; Bring from borrow pit, $2.3 per m Determine (a) the cost for each combination of haul, cut and fill for 200m, 300m and 400m haul (b) plot the cost of each respective haul distance and then determine the economic haul distance Chainage 0~ 200 400 600 800~ 1000 1200 1400 1600 1800 Total (m) 200 400 600 800 1000 Cut (x1000m3) Fill (x1000m3) Bulking factor 10% included Cumulative Volume Cut less Fill i.e. Excess Cut +ve Shortfall Fill -ve 40 70 0 0 30 0 0 0 18.2 36.4 N N 45.5 N 18.2 1200 1400 1600 1800 2000 0 0 40 40 0 N 0 N 0 18.2
Step by Step Solution
There are 3 Steps involved in it
Step: 1
a Each sections excess cut or shortfall Chainage 0200 Cut 40000 m3 Fill 70000 m3 Shortfall Fill Cut ...Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started