the highlighted parts say: 1) 24 hinges at $.50 each 2) Fork truck put away, retrieve, load at 1 pallet per trip. 3) and all
the highlighted parts say:
1) 24 hinges at $.50 each
2) Fork truck put away, retrieve, load at 1 pallet per trip.
3) and all shipments to costumers use truckload with a 45,000 loadable weigh target
ignore part four and the paragraph is included in
educe Mower Costs SC 301 Tractor Mower Co-Lean Six Sigma and Other Ideas to R Team Assignment- Turn in with McDonald's French Fry (each worth SO Pts) New Cost Selling Price (To Retailer)$1,600 Description Summary Cost Red'n Idea* Est'd Cost Red'n Values in Col'n $ Values in Col'n t Cost Elements (8 in Total) Materials Cost per Mower Kohler Steel Engine& Steel body w/foam seat 1/2 inch thick plywood 1 Mower & It's Parts 2 Plywood Protective Pkg's 3 Brass Hinges 4 Wooden Pellet $350 $280 $12 10 Hardwood Pallet Sub Total Mtls Plant Labor Cost per Mower Mower Assembly Shipping Crate Assembly Total Plant Labor Total DMC 100 Automated Prod'n Line at 20 per hour 10 Assemble Crate Manually 110 Plant Labor Rate $25/hr $762 5 6 7 Transportation (Pre Cowan) $29 Rounded from $28.57 8 Warehouse Labor $4 $795 $805 COGS Gross Margin Gross Margin % 50% Based on shipment of 1000 miles at $1 per mile in 53' Trailer with 45,000 lb loadable wt Provide up to a 1/2 page for each idea with Assumptions and Financial Analysis Entire Facility Operates One Shift from 8 am to 4:30 pm for an 8 hour paid work day Hourly employees 2 paid 15 min breaks: one 30 minute unpaid lunch The 15 min breaks for the entire facility are 10 to 10:15 am and 2:30 to 2:45 pm The lunch period for the entire facility is 12 to 12:30 pm educe Mower Costs SC 301 Tractor Mower Co-Lean Six Sigma and Other Ideas to R Team Assignment- Turn in with McDonald's French Fry (each worth SO Pts) New Cost Selling Price (To Retailer)$1,600 Description Summary Cost Red'n Idea* Est'd Cost Red'n Values in Col'n $ Values in Col'n t Cost Elements (8 in Total) Materials Cost per Mower Kohler Steel Engine& Steel body w/foam seat 1/2 inch thick plywood 1 Mower & It's Parts 2 Plywood Protective Pkg's 3 Brass Hinges 4 Wooden Pellet $350 $280 $12 10 Hardwood Pallet Sub Total Mtls Plant Labor Cost per Mower Mower Assembly Shipping Crate Assembly Total Plant Labor Total DMC 100 Automated Prod'n Line at 20 per hour 10 Assemble Crate Manually 110 Plant Labor Rate $25/hr $762 5 6 7 Transportation (Pre Cowan) $29 Rounded from $28.57 8 Warehouse Labor $4 $795 $805 COGS Gross Margin Gross Margin % 50% Based on shipment of 1000 miles at $1 per mile in 53' Trailer with 45,000 lb loadable wt Provide up to a 1/2 page for each idea with Assumptions and Financial Analysis Entire Facility Operates One Shift from 8 am to 4:30 pm for an 8 hour paid work day Hourly employees 2 paid 15 min breaks: one 30 minute unpaid lunch The 15 min breaks for the entire facility are 10 to 10:15 am and 2:30 to 2:45 pm The lunch period for the entire facility is 12 to 12:30 pmStep by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started