Answered step by step
Verified Expert Solution
Link Copied!

Question

1 Approved Answer

the highlighted parts say: 1) 24 hinges at $.50 each 2) Fork truck put away, retrieve, load at 1 pallet per trip. 3) and all

image text in transcribed

the highlighted parts say:

1) 24 hinges at $.50 each

2) Fork truck put away, retrieve, load at 1 pallet per trip.

3) and all shipments to costumers use truckload with a 45,000 loadable weigh target

ignore part four and the paragraph is included in

educe Mower Costs SC 301 Tractor Mower Co-Lean Six Sigma and Other Ideas to R Team Assignment- Turn in with McDonald's French Fry (each worth SO Pts) New Cost Selling Price (To Retailer)$1,600 Description Summary Cost Red'n Idea* Est'd Cost Red'n Values in Col'n $ Values in Col'n t Cost Elements (8 in Total) Materials Cost per Mower Kohler Steel Engine& Steel body w/foam seat 1/2 inch thick plywood 1 Mower & It's Parts 2 Plywood Protective Pkg's 3 Brass Hinges 4 Wooden Pellet $350 $280 $12 10 Hardwood Pallet Sub Total Mtls Plant Labor Cost per Mower Mower Assembly Shipping Crate Assembly Total Plant Labor Total DMC 100 Automated Prod'n Line at 20 per hour 10 Assemble Crate Manually 110 Plant Labor Rate $25/hr $762 5 6 7 Transportation (Pre Cowan) $29 Rounded from $28.57 8 Warehouse Labor $4 $795 $805 COGS Gross Margin Gross Margin % 50% Based on shipment of 1000 miles at $1 per mile in 53' Trailer with 45,000 lb loadable wt Provide up to a 1/2 page for each idea with Assumptions and Financial Analysis Entire Facility Operates One Shift from 8 am to 4:30 pm for an 8 hour paid work day Hourly employees 2 paid 15 min breaks: one 30 minute unpaid lunch The 15 min breaks for the entire facility are 10 to 10:15 am and 2:30 to 2:45 pm The lunch period for the entire facility is 12 to 12:30 pm educe Mower Costs SC 301 Tractor Mower Co-Lean Six Sigma and Other Ideas to R Team Assignment- Turn in with McDonald's French Fry (each worth SO Pts) New Cost Selling Price (To Retailer)$1,600 Description Summary Cost Red'n Idea* Est'd Cost Red'n Values in Col'n $ Values in Col'n t Cost Elements (8 in Total) Materials Cost per Mower Kohler Steel Engine& Steel body w/foam seat 1/2 inch thick plywood 1 Mower & It's Parts 2 Plywood Protective Pkg's 3 Brass Hinges 4 Wooden Pellet $350 $280 $12 10 Hardwood Pallet Sub Total Mtls Plant Labor Cost per Mower Mower Assembly Shipping Crate Assembly Total Plant Labor Total DMC 100 Automated Prod'n Line at 20 per hour 10 Assemble Crate Manually 110 Plant Labor Rate $25/hr $762 5 6 7 Transportation (Pre Cowan) $29 Rounded from $28.57 8 Warehouse Labor $4 $795 $805 COGS Gross Margin Gross Margin % 50% Based on shipment of 1000 miles at $1 per mile in 53' Trailer with 45,000 lb loadable wt Provide up to a 1/2 page for each idea with Assumptions and Financial Analysis Entire Facility Operates One Shift from 8 am to 4:30 pm for an 8 hour paid work day Hourly employees 2 paid 15 min breaks: one 30 minute unpaid lunch The 15 min breaks for the entire facility are 10 to 10:15 am and 2:30 to 2:45 pm The lunch period for the entire facility is 12 to 12:30 pm

Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access with AI-Powered Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image

Step: 3

blur-text-image

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Students also viewed these Accounting questions