The Ivanpah solar thermal power plant cost $2.2 billion to build. The gross plant electric output is 392 MW, and the net output is 377
The Ivanpah solar thermal power plant cost $2.2 billion to build. The gross plant electric output is 392 MW, and the net output is 377 MW. The planned capacity factor was 27.4%, but the actual capacity factor in 2016 was 20.5%. At best the plant thermal efficiency appears to be 18%. In addition, for the daily startup process, the solar plant also burned 1.31012 Btu of natural gas in 2016. The cost of natural gas in 2016 was about $2.5 per million Btu. Assuming a levelized annual fixed charge rate of 7%, determine (a) the electricity capital cost (/kWh), and (b) the electricity fuel cost (/kWh) during the startup process. For part (b), the fuel costs should be prorated (spread) across all the electricity produced by the plant
Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started