For Borrow Site #1, #2, #3, calculate the following a. The total volume of material available at each borrow site (in BCY). UNIT = BCY
For Borrow Site #1, #2, #3, calculate the following
a. The total volume of material available at each borrow site (in BCY). UNIT = BCY
b. Total material purchase cost for each site. UNIT = $
c. Based on the variables you selected, the earthwork production rate (Load, Haul, Dump) for each site using different . UNIT = BCY/HR
d. Total unit cost for Load, Haul, Dump. UNIT = $/BCY
e. Calculate the compactor production rate for each borrow source. UNIT = BCY/HR
f. Calculate how many compactors are required to keep up with the fill from each borrow source. UNIT = EACH
g. Calculate unit cost for compaction. UNIT = $/BCY
h. Calculate total unit cost for each borrow site to determine which borrow sources to utilize. UNIT = $/BCY
2. Assuming you can only work one borrow source at a time, determine the total cost for your project based on the variables you selected. (In other words, determine the best source for the project, then exhaust that source, moving to the next best selection.) UNIT = $
3. Based on your calculations, how many weeks will it take you to complete the project assuming your crews will work a 5/10 work week? UNIT = WEEKS
You have located a total of three (3) potential material sources for your import operations. Each of the potential sites have been lab tested and appear to meet the minimum requirements for material in the specs (Gradation, Plasticity index, Liquid limit, etc.). One (1) of the sources are landowners with property immediately adjacent to the new levee allowing for the use of scrapers, and two (2) are offsite borrow sites which will require trucking on public roads. No single source has enough material for the entire project, so a combination of sources will be required.
Borrow Source #1: (REFER TO ATTACHMENT) This source is rectangular in shape and is located adjacent the levee footprint along the landside. The parcel runs 1000 feet along the levee and is 800 feet wide. The landowner has recently cleared the parcel, so no stripping will be required. She is willing to allow you to excavate up to a maximum of four (4) feet deep so long as the final 5-foot edge around the entire excavation is left at a gradual 4:1 slope when the borrow operation is complete. Her price for the dirt is $2.20 per cubic yard. After reviewing the lab results for the source, you estimate this material will swell approximately 15% when excavated and will shrink approximately 12% when compacted. Use a scraper fill factor of 90% (SLF =.90) for this borrow site. Use an average one-way travel distance of 900 ft.
Borrow Source #2: NO IMAGE NEEDED. Borrow source #2 is located five (5) miles from the project. The source is a local quarry that has been stockpiling overburden for years. They are willing to sell overburden material to you for $1.20 per loose cubic yard. The quarry estimates that they have 180,000 loose cubic yards of material available. The quarry has a loader with a 5.5 CY bucket available onsite to load the trucks. Lab results show that this material has an in-situ (BCY) density of 108 pcf and swelled approximately 12% when excavated and will shrink approximately 16% when compacted. Use a bucket fill factor of 0.90 and a Basic Cycle time of 0.65 minutes (39 secs). After driving the haul route and observing speed limit signs you estimate the trucks will be able to haul to the site at an average speed of 28 MPH and return from the site at 34 MPH. Trucks will be Bottom Dumps.
Borrow Source #3: NO IMAGE NEEDED. Borrow source #3 is located four (4) miles from the project. The source is a local truck company that allowed previous customers to stockpile excavation spoils there. They are willing to sell the material to you at a delivered price of $4.55 per loose cubic yard (delivered in bottom dumps). The truck broker estimates that he has 100,000 loose cubic yards of material available. Lab results show that this material has an in-situ (BCY) density of 118 pcf and swelled approximately 15% when excavated and will shrink approximately 16% when compacted. The broker says they average a 3 min load time and the trucks will deliver an average payload of 12.9 BCY per truck. After driving the haul route and observing speed limit signs you estimate the trucks will be able to haul to the site at an average speed of 23 MPH and return from the site at 30 MPH. Trucks will be Bottom Dumps.
Equipment and Labor Costs:
Operators (All Equipment except trucks) $95.00
Truck Drivers $70.00
621K Scraper $215.00
631K Scraper $238.00
D8 Dozer $210.00
D9 Dozer $248.00
D10 Dozer $306.00
Wheel Loader w/5.5 CY bucket $148.00
Excavator with 3 CY bucket $126.00
Bottom Truck $88.00
CAT 815 Compactor $200.0
Additional Information:
Borrow Site #1 Image:
The Lawton Law Firm has a decentralized structure that includes three segments, Wills, Criminal Defense and Real Estate. Data for each segment is provided in the table below. The partners of the firm want to eliminate the wills segment. Should the Lawton Law Firm eliminate the Wills Division? Sales Direct Fixed Costs Wills $175,000 $200,000 Criminal Defense $400,000 $175,000 Real Estate $285,000 $135,000
Step by Step Solution
3.49 Rating (152 Votes )
There are 3 Steps involved in it
Step: 1
a Total volume of material available at each borrow site in BCY Borrow Site 1 The parcel is 1000 ft x 800 ft The maximum excavation depth is 4 ft Accounting for the 5 ft gradual 41 slope around the pe...Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started