The manufacturer of a drilling machine wants to produce at least 2000 units of the drilling machine from three machines as stated in the table

The manufacturer of a drilling machine wants to produce at least 2000 units of the drilling machine from three machines as stated in the table above. The minimum lot size for each of the three machines is 500 units. A complete unit of the drilling machine is only considered as a valid finished good. The production per unit cost, setup cost and the maximum capacity have been provided in the table too. Design an OR model to minimize the total production cost.
image

Machine 1 2 3 Setup cost (INR) 300 100 200 Production cost/unit (INR) 2 10 5 Capacity (units) 600 800 1200 The manufacturer of a drilling machine wants to produce at least 2000 units of the drilling machine from three machines as stated in the table above. The minimum lot size for each of the three machines is 500 units. A complete unit of the drilling machine is only considered as a valid finished good. The production per unit cost, setup cost and the maximum capacity have been provided in the table too. Design an OR model to minimize the total production cost.

Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access to Expert-Tailored Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image

Step: 3

blur-text-image

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Recommended Textbook for

Operations Research An Introduction

Authors: Hamdy A. Taha

9th Edition

013255593X, 978-0132555937

More Books

Students also viewed these General Management questions

Question

How much is $102 after a decrease of 100%?

Answered: 1 week ago

Question

Calculate the missing value.

Answered: 1 week ago