The Nelson Mandela Bay Municipality (NMBM) drawing number P093 shows a trapezoidal channel with construction detail. Study all the given information and answer the
The Nelson Mandela Bay Municipality (NMBM) drawing number P093 shows a trapezoidal channel with construction detail. Study all the given information and answer the following: a) If the water level in the channel reaches the top edges of the concrete channel (completely full), calculate the discharge if the longitudinal slope is 2,4%. b) State the Froude number and type of flow for (a). c) Test the channel for buoyancy. d) Determine the safety factor (FOS) for this channel against buoyancy. 1:20 300 BITUMEN PRIME 0.71/ OR 20 MIOPRON POLYETHYLENE SHEETING 12800 LIN *200mm / DATE OF LAST REVISION NOTES: 1. Concrate lining to be 100mm thick, using Class 25/19 concrete, cast in alternative sections of lengths not exceeding 3,00m. 2. Nood floated finian to surface of concreto channel. 3. Top edge of joint to be finished with Snn Arris. 4. Joint sesler shall be pre-moulded strips of preformed Neoprene compressed saal, inserted with special tool and lubricant adhesive into joints or alternative approved sealant. JULY 2007 PREPARED BY: INSTRUCTURE AND ENGINEERING 1200 B00 PROPOSED IN-SITU CONCRETE CHANNEL ALONG INVERT OF REGRADED STORMWATER CANAL DIRECTORATE 20 fo GINT SEALEN DETAIL OF JOINT (EVERY 3,00m] 10 93 25 STANDARD DETAILS- CAST IN-SITU CONCRETE CHANNEL IN REGRADED STORMWATER CANAL 300 4CO 1:26 150 SUB-0ASE QUALITY MATERIAL COMPACTED TO BE OF MODIFIED AASHTO MAXIMUM DENBITY ONLY WHERE CACERES ONE SIDE BITUMEN COATING ON STERL 100 NOT TO SCALE DRAWING No PSLE 9/4 1: 20- FRED aa NOTES: & BITUMEN PAINED (0.71/m) OR 250 MICRON POLYETHYLENE SHEETING DATE OF LAST REVISION 300 19 R12 BAR 800mm LONG 8 200mm /c JULY 2007 PREPARED BY: INFRASTRUCTURE AND ENGINEERING DIRECTORATE 1 1. Concrete lining to be 100mm thick, using Class 25/19 concrete, cast in alternative sections of lengths not exceeding 3, 00m. 2. Wood floated finish to surface of concrete channel. 3. Top edge of joint to be finished with 5mm Arris. 4. Joint sealer shall be pre-moulded strips of preformed Neoprene compressed seal, inserted with special tool and lubricant adhesive into joints or alternative approved sealant. PROPOSED IN-SITU CONCRETE CHANNEL ALONG INVERT OF REGRADED STORMWATER CANAL 1200 400 600 51 10, 20 JOINT SEALER DETAIL OF JOINT (EVERY 3, 00m) 26 93 10 10 265 STANDARD DETAILS- CAST IN-SITU CONCRETE CHANNEL IN REGRADED STORMWATER CANAL 300 400 120 150mm Gb SUB-BASE QUALITY MATERIAL COMPACTED TO 95% OF MODIFIED AASHTO MAXIMUM DENSITY ONLY WHERE ORDERED! ONE SIDE BITUMEN COATING ON STEEL 100 NOT TO SCALE DRAWING No PSLE 9/4
Step by Step Solution
★★★★★
3.54 Rating (175 Votes )
There are 3 Steps involved in it
Step: 1
aThe crosssectional area of the channel is 185m2 A trapezoidal channel is a rectangle with one slope...Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started