Answered step by step
Verified Expert Solution
Question
1 Approved Answer
The Normal time for a work cycle in a worker-machine systemic 6.27 min .Forsettingthe standard time, the PFD allowance factor is 12%, and the machine
The Normal time for a work cycle in a worker-machine systemic 6.27 min .Forsettingthe standard time, the PFD allowance factor is 12%, and the machine allowance factor is 25%. The work cycle includes manual elements totaling a normal time of 5.92 min, all but 0.65 min of which are performed as internal elements. Determine (a) the standard time for the cycle and (b) the daily output at standard performance. (c) During an 8-hour shift, the worker lost 39 min due to personal time, rest breaks, and delays, and she produced 72 pieces. What was the workers pace on the operator-controlled portion of the shift?
Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started