The path with the greatest time length is referred to as the critical path, as well as the operations that collapse on the critical path
The path with the greatest time length is referred to as the critical path, as well as the operations that collapse on the critical path are referred to as crucial activities. Calculate the duration of time of every feasible paths is given below: Path 1: 1-2-5-8-10 = 4+2+5+3+7