Answered step by step
Verified Expert Solution
Link Copied!

Question

1 Approved Answer

The Platter Valley factory of Bybee Industries manufactures field boots. The cost of each boot includes direct materials, direct labor, and manufacturing (factory) overhead. The

image text in transcribed

The Platter Valley factory of Bybee Industries manufactures field boots. The cost of each boot includes direct materials, direct labor, and manufacturing (factory) overhead. The firm traces all direct costs to products, and it assigns overhead cost to products based on direct labor hours. The company budgeted $10,120 variable factory overhead cost, $94,300 for fixed factory overhead cost and 2,300 direct labor hours (its practical capacity) to manufacture 4,600 pairs of boots in March. The factory used 4,300 direct labor hours in March to manufacture 4,400 pairs of boots and spent $17,400 on variable overhead during the month. The actual fixed overhead cost incurred for the month was $97,900. The Platter Valley factory of Bybee Industries uses a two-variance analysis of the total factory overhead variance. Required: 1. Compute the total flexible-budget variance for overhead and the production volume variance for March. What was the total factory overhead cost variance for March? Indicate whether each variance is favorable (F) or unfavorable (U). 2. Determine the three components of the total flexible-budget variance for overhead (i.e., the variable overhead spending variance, the variable overhead efficiency variance, and the fixed overhead spending variance); in addition, show the production volume variance for March. Indicate whether each variance is favorable (F) or unfavorable (U). Answer is not complete. Complete this question by entering your answers in the tabs below. Required 1 Required 2 Compute the total flexible-budget variance for overhead and the production volume variance for March. What was the total factory overhead cost variance for March? Indicate whether each variance is favorable (F) or unfavorable (U). $ Total flexible-budget variance Production volume variance Total overhead cost variance $ 7,720 X Unfavorable 1,520 X Unfavorable 9,250 Unfavorable $ Required 1 Required 2 >

Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access to Expert-Tailored Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image_2

Step: 3

blur-text-image_3

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Recommended Textbook for

Management Control Systems Performance Measurement Evaluation And Incentives

Authors: Kenneth Merchant, Wim Van Der Stede

3rd Edition

0273737619, 978-0273737612

More Books

Students also viewed these Accounting questions

Question

=+c) What is/are the response(s)?

Answered: 1 week ago