Answered step by step
Verified Expert Solution
Question
1 Approved Answer
The projected cost of a lamp is calculated based upon the projected increases or decreases to current costs. The present costs to manufacture one lamp
The projected cost of a lamp is calculated based upon the projected increases or decreases to | |||||||
current costs. The present costs to manufacture one lamp are: | |||||||
Lamp Kit: | $16.0000000 | per lamp | |||||
Direct Labor: | 2.0000000 | per lamp (4 lamps/hr.) | |||||
Variable Overhead: | 2.0000000 | per lamp | |||||
Fixed Overhead: | 10.0000000 | per lamp (based on normal capacity of 25,000 lamps) | |||||
Cost per lamp: | $30.0000000 | per lamp | |||||
Expected increases for 20x2 | |||||||
When calculating projected increases round to TWO ($0.00) decimal places. | |||||||
1. Material Costs are expected to increase by 6.00% . | |||||||
2. Labor Costs are expected to increase by 2.50%. | |||||||
3. Variable Overhead is expected to increase by 5.00%. | |||||||
4. Fixed Overhead is expected to increase to $255,000. | |||||||
5. Fixed Administrative expenses are expected to increase to $58,000. | |||||||
6. Variable selling expenses (measured on a per lamp basis) are expected to increase | |||||||
by 3.50%. | |||||||
7. Fixed selling expenses are expected to be $29,000 in 20x2. | |||||||
8. Variable administrative expenses (measured a per lamp basis) are expected to | |||||||
increase by 3.00%. | |||||||
On the following schedule develop the following figures:
| |||||||
1- 20x2 Projected Variable Manufacturing Unit Cost of a lamp. | |||||||
2- 20x2 Projected Variable Unit Cost per lamp. | |||||||
3- 20x2 Projected Fixed Costs. | |||||||
Variable Manufacturing Unit Cost | ||||
20x1 Cost | Projected Percent Increase | 20x2 Cost Rounded to 2 Decimal Places | ||
Lamp Kit | 16 | {4.01} | ||
Labor | {4.02} | |||
Variable Overhead | {4.03} | |||
Projected Variable Manufacturing Cost Per Unit | {4.04} | |||
Total Variable Cost Per Unit | ||||
20x1 Cost | Projected Percent Increase | 20x2 Cost Rounded to 2 Decimal Places | ||
Variable Selling | {4.05} | |||
Variable Administrative | {4.06} | |||
Projected Variable Manufacturing Unit Cost | {4.04} | |||
Projected Total Variable Cost Per Unit | {4.07} | |||
Schedule of Fixed Costs | ||||
20x1 Cost | Projected Percent Increase | 20x2 Cost | ||
Fixed Overhead | {4.08} | |||
(normal capacity of _________ lamps @ __ ) | ||||
Fixed Selling | {4.09} | |||
Fixed Administrative | {4.10} | |||
Projected Total Fixed Costs | {4.11} | |||
Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started