Answered step by step
Verified Expert Solution
Question
1 Approved Answer
The projected cost of a lamp is calculated based upon the projected increases or decreases to current costs. The present costs to manufacture one lamp
The projected cost of a lamp is calculated based upon the projected increases or decreases to current costs. The present costs to manufacture one lamp are: Lamp Kit: Direct Labor: Variable Overhead: Fixed Overhead: $16.0000000 per lamp 2.0000000 per lamp (4 lamps/hr.) 2.0000000 per lamp 10.0000000 per lamp (based on normal capacity of 25,000 lamps) Cost per lamp: $30.0000000 per lamp Expected increases for 20x2 When calculating projected increases round to TWO ($0.00) decimal places. 1. Material Costs are expected to increase by 4.50% . 2. Labor Costs are expected to increase by 4.50%. 3. Variable Overhead is expected to increase by 4.00%. 4. Fixed Overhead is expected to increase to $280,000. 5. Fixed Administrative expenses are expected to increase to $44,000. 6. Variable selling expenses (measured on a per lamp basis) are expected to increase by 4.00% 7. Fixed selling expenses are expected to be $31,000 in 20x2. 8. Variable administrative expenses (measured a per lamp basis) are expected to increase by 6.50%. On the following schedule develop the following figures: 1- 20x2 Projected Variable Manufacturing Unit Cost of a lamp. 2- 20x2 Projected Variable Unit Cost per lamp. 3- 20x2 Projected Fixed Costs. Variable Manufacturing Unit Cost 20x1 Cost Projected Percent Increase 20x2 Cost Rounded to 2 Decimal Places Lamp Kit Labor Variable Overhead {4.01} {4.02) {4.03} Projected Variable Manufacturing Cost Per Unit {4.04} Total Variable Cost Per Unit 20x1 Cost Projected Percent Increase 20x2 Cost Rounded to 2 Decimal Places Variable Selling Variable Administrative Projected Variable Manufacturing Unit Cost {4.05) {4.06} {4.04} Projected Total Variable Cost Per Unit {4.07} Schedule of Fixed Costs 20x1 Cost 20x2 Cost Projected Percent Increase {4.08} lamps @_) Fixed Overhead (normal capacity of Fixed Selling Fixed Administrative {4.09} {4.10} Projected Total Fixed Costs {4.11}
Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started