The rig cost when running the casing is $170,000/day The casing will be run at 1000 ft/hr Casing crew costs $2,000/hr when running the production casing $1,000/hr when traveling $1,000/hr when on standby (on the rig but not running casing) The casing crew rental equipment charges $450/hr when in use $225/hr when when traveling $225/hr when on standby The equipment travels with the crew The casing crew will leave the dock at 6am on Monday and arrive at the rig at 11am that day. The casing crew departs the rig Tuesday at 1pm and arrives at the dock at 5pm that day. Misc casing equipment includes float equipment ($4,200) and centralizers ($8,800) Float shoe $4,200 Float collar $4,000 Centralizers 44 at $125/each Casing crew cost Running casing ($) Travel Standby ($) ($) Casing crew rental costs Running casing Travel Standby ($) ($) ($) Misc equipment charges Float eqpt Centralizers ($) ($) Total cost to run the production casing Total 5 6 7-5/8" production casing - tangible Length Cost Total Cost (ft) ($/ft) ($) $44.77 7 9 7 -5/8" production casing - run cost 1 2 Rig cost ($) Total Cost ($) The rig cost when running the casing is $170,000/day The casing will be run at 1000 ft/hr Casing crew costs $2,000/hr when running the production casing $1,000/hr when traveling $1,000/hr when on standby (on the rig but not running casing) The casing crew rental equipment charges $450/hr when in use $225/hr when when traveling $225/hr when on standby The equipment travels with the crew The casing crew will leave the dock at 6am on Monday and arrive at the rig at 11am that day. The casing crew departs the rig Tuesday at 1pm and arrives at the dock at 5pm that day. Misc casing equipment includes float equipment ($4,200) and centralizers ($8,800) Float shoe $4,200 Float collar $4,000 Centralizers 44 at $125/each Casing crew cost Running casing ($) Travel Standby ($) ($) Casing crew rental costs Running casing Travel Standby ($) ($) ($) Misc equipment charges Float eqpt Centralizers ($) ($) Total cost to run the production casing Total 5 6 7-5/8" production casing - tangible Length Cost Total Cost (ft) ($/ft) ($) $44.77 7 9 7 -5/8" production casing - run cost 1 2 Rig cost ($) Total Cost ($)