Answered step by step
Verified Expert Solution
Link Copied!

Question

1 Approved Answer

The Silver Corporation uses a departmental predetermined overhead rate to apply manufacturing overhead to jobs. The predetermined overhead rate is based on labor cost in

The Silver Corporation uses a departmental predetermined overhead rate to apply manufacturing overhead to jobs. The predetermined overhead rate is based on labor cost in each of three Departments: Fabrication, Machining and Assembly. At the beginning of the year, the Corporation made the following estimates:

Manufacturing Overhead $350,000 Fabrication

$400,000 Machining

$90,000 Assembly

$840,000 Total

Labor Cost $200,000 Fabrication

$100,000 Machining

$300,000 Assembly

$600,000 Total

1.Calculate the plantwide predetermined overhead rate .

2.Calculate the fabrication predetermined overhead rate .

3.Calculate the machining predetermined overhead rate

4.Calculate the assembly predetermined overhead rate

Based on these rates, Calculate the total manufacturing cost attributed to job XYZ below.

5. What is the Total cost .

Direct Materials $3,000 Fabrication

$200 Machining

$1,400 Assembly

$4,600 Total

Direct Labor $2,800 Fabrication

$500 Machining

$6,200 Assembly

$9,500 Total

Solve Parts 1-5

Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access to Expert-Tailored Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image_2

Step: 3

blur-text-image_3

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Recommended Textbook for

Auditing An International Approach

Authors: Bahram Soltani

1st Edition

9780273657736

More Books

Students also viewed these Accounting questions