Answered step by step
Verified Expert Solution
Link Copied!

Question

1 Approved Answer

The Stik Pen Corporation assembles ball point pens at its Tennessee facility for its line of low priced office stationary products. The Tennessee facility produces

The Stik Pen Corporation assembles ball point pens at its Tennessee facility for its line of low priced office stationary products. The Tennessee facility produces pens for distribution throughout North America.
The pen assembly line consists of seven stations connected by a high speed conveyor system and automated material handling equipment that move individual pen assemblies along a fully connected machine paced line. The overall flow is illustrated in Figure 1 and Table 1 provides station specific information including the activity time per pen and number of worked assigned to each station. At stations with more than one worker, the activity is performed in parallel (e.g., for Station 3, each of the 5 employees works on different pens and each takes 72 seconds to complete one pen). The conveyor belt splits into parallel lines at these stations but continues to be synchronized.
Ballpoint Assemblies.JPG
Figure 1 Stik Pen Ballpoint Pen Assembly Line Process Flow Diagram
Station Task Activity Time (per pen) Number of resources*
1 Cartridge/Ballpoint Assembly 8 seconds 1 worker
2 Insert Cartridge into Pen Molding 14 seconds 1 worker
3 Pen Molding Assembly 172 seconds 5 workers
4 Pen Molding Assembly 244 seconds 4 workers
5 Grip Assembly 25 seconds 2 workers
6 Inspect/Test 120 seconds 6 workers
7 Packaging 30 seconds 3 workers
Table 1: Stik Pen Process Flow and Data for the Ballpoint Pen Assembly Line
Which station is the capacity bottleneck?

Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access to Expert-Tailored Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image

Step: 3

blur-text-image

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Recommended Textbook for

Successful Time Management

Authors: Patrick Forsyth

1st Edition

0749486198, 978-0749486198

More Books

Students also viewed these General Management questions

Question

a = 2 5 5 ; data type

Answered: 1 week ago

Question

9. Understand the phenomenon of code switching and interlanguage.

Answered: 1 week ago