The total cost at the end of the previous production stage was $10, and the overhead allocation rate is $52.43 per machine hour. What is
The total cost at the end of the previous production stage was $10, and the overhead allocation rate is $52.43 per machine hour. What is the total cost at the end of this production stage if no labor is used during this stage's 37 minutes of processing time?