The total cost of a sewage treatment plant with a capacity of 5 0 million gallons per day completed 2 0 1 7 for a

The total cost of a sewage treatment plant with a capacity of 50 million gallons per
day completed 2017 for a new town in Colorado was $4.5 million. It was proposed that a similar
treatment plant with a capacity of 80 million gallons per day be built in another town in New Jersey
for completion in 2021. For additional information given below, make a screening estimate of the
cost of the proposed plant.
In the total construction cost in Colorado, an item of $300,000 for site preparation is not
typical for similar plants.
The variation of sizes for this type of treatment plants can be approximated by the
exponential law with m =0.5.
The inflation rate is approximately 5% per year from 2015 to 2025.
The locational indices of Colorado and New Jersey areas are 0.95 and 1.10, respectively,
against the national average of 1.00.
The installation of a special equipment to satisfy the new environmental standard cost an
extra $200,000 in 2021 dollar for the New Jersey plant.
The site condition in New Jersey required special foundation which cost $500,000 in 2021
dollars.

Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access with AI-Powered Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image

Step: 3

blur-text-image

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Students also viewed these General Management questions