Answered step by step
Verified Expert Solution
Link Copied!

Question

1 Approved Answer

The Ventron Engineering Company has just been awarded a $2 million development contract by the U.S. Army Aviation Systems Command to develop a blade spar

"The Ventron Engineering Company has just been awarded a $2 million development contract by the U.S. Army Aviation Systems Command to develop a blade spar for its Heavy Lift Helicopter program. The blade spar is a metal tube that runs the length of and provides strength to the helicopter blade. Due to the unusual length and size of the Heavy Lift Helicop-ter blade, Ventron is unable to produce a single-piece blade spar of the required dimensions using existing extrusion equipment and material. The engineering department has prepared two alternatives for developing the blade spar: (1) sectioning or (2) an improved extrusion process. Ventron must decide which process to use. (Backing out of the con-tract at any point is not an option.) The risk report has been prepared by the engineering department. The information from this report is explained next" The sectioning option involves joining several shorter lengths of extruded metal into a blade spar of sufficient length. This work will require extensive testing and rework over a 12-month period at a total cost of $1.8 million. Although this process will definitely produce an adequate blade spar, it merely represents an extension of existing technology.To improve the extrusion process, on the other hand, it will be necessary to perform two steps: (1) improve the mate-rial used, at a cost of $300,000, and (2) modify the extrusion press, at a cost of $960,000. The first step will require six months of work, and if this first step is successful, the second step will require another six months of work. If both steps are successful, the blade spar will be available at that time, that is, a year from now. The engineers estimate that the probabilities of succeeding in steps 1 and 2 are 0.9 and 0.75, respectively. However, if either step is unsuccessful (which will be known only in six months for step 1 and in a year for step 2), Ventron will have no alternative butto switch to the sectioning processand incur the sectioning cost on top of any costs already incurred.Development of the blade spar must be completed within 18 months to avoid holding up the rest of the con-tract. If necessary, the sectioning work can be done on an accelerated basis in a six-month period, but the cost of sec-tioning will then increase from $1.8 million to $2.4 million. The director of engineering, Dr.Smith, wants to try devel-oping the improved extrusion process. He reasons that this is not only cheaper (if successful) forthe current project, but its expected side benefits for future projects could be sizable. Although these side benefits are difficult to gauge, Dr.Smith's best guess is an additional $2 million. (These side benefits are obtained only if both steps of the modified extrusion process are completed successfully.)a.Develop a decision tree to maximize Ventron's EMV. This includes the revenue from this project, the side benefits (if applicable) from an improved extrusion pro-cess, and relevant costs. You don't need to worry about the time value of money; thatis, no discounting or net present values are required. Summarize your findings in words in thespreadsheet.b.What value of side benefits would make Ventron indif-ferent between the two alternatives?c.How much would Ventron be willing to pay, right now, for perfect information about both steps of theimproved extrusion process? (This information would tell Ventron, right now, the ultimate success or failure outcomes of both steps.)"

  • Develop a decision tree to maximize Ventron's expected monetary value (EMV).
    • This includes the revenue from this project, the side benefits (if applicable) from an improved extrusion process, and relevant costs.
    • You don't need to worry about time value of money; that is, no discounting or net present values are required.
  • Summarize your findings in words in the spreadsheet.

Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access to Expert-Tailored Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image

Step: 3

blur-text-image

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Recommended Textbook for

Strategic Brand Management Building Measuring and Managing Brand Equity

Authors: Kevin Lane Keller

4th edition

9780273779414, 132664259, 273779419, 978-0132664257

More Books

Students also viewed these General Management questions

Question

Determine miller indices of plane X z 2/3 90% a/3

Answered: 1 week ago