Question
The World Bank is considering an application from the country of Equatoria for a large dam project. Some costs and benefits of the project (dollar
The World Bank is considering an application from the country of Equatoria for a large dam project. Some costs and benefits of the project (dollar values) are as follows:
Construction costs: $500 million/year for three years
Operating costs: $50 million/year
Hydropower to be generated: 3 billion Kilowatt hours/year
Price of electricity: $0.05/Kilowatt hour
Irrigation water available from the dam: 5 billion gallons/year
Price of water: $0.02/gallon
Agricultural product lost from flooded lands: $45 million/year
Forest products lost from flooded lands: $20 million/year
There are also additional, less easily quantifiable, losses: human costs to villagers who will be forced to move, watershed damage, and ecological costs of habitat destruction. It is also possible that the new lake are may contribute to the spread of water-borne diseases.
an alternative project: a number of smaller dams constructed so as not to flood significant agricultural or forest lands. For this project, total construction costs are exactly half the costs of the big dam project, and power/irrigation benefits are also half as much. But there is no damage to farmland or forest, and there are no ecological or resettlement costs.
a. Do a complete cost-benefit analysis of the alternative project if the interest rate is 10%.
b. Do a complete cost-benefit analysis of the alternative project if the interest rate is 5%.
For each scenario (a. to b.), indicate a definite yes, definite no, or uncertain result (25 points
Complete the Data summary (for each scenario analyzed)
Costs | PV | Benefits | PV |
Construction | $? | Hydro Power | $? |
Operation | $? | Irrigation Water | $? |
Flooded Ag | $? | Total PV of Benefits | $? |
Flooded Forests | $? | ||
Total PV of Costs | $? | ||
Net Benefits (NPV) | |||
NB=PVB - PVC | ? | ||
Discount Rate | ?% | ||
n | ? | useful life time of the dam (after construction) | |
Current Value | CV(annual) | ||
Costs | |||
Construction | $? | ||
Operation | $? | ||
Flooded Ag | $? | ||
Flooded Forests | $? | ||
Benefits | |||
Hydro Power | $? | ||
Irrigation Water | $? |
Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started